RU

Substation Sportivnaya

Construction of a substation 110/10 kV for PAO «IDGC Yuga»
2017
Rostov-on-Don
Construction of the substation «Sportivnaya» is the contribution of «Energia Yuga» company to preparations for the 2018 FIFA World Cup.
A large-scale and high-tech facility, built just within a year, ensured reliable power supply to the Rostov Arena stadium and the entire left river bank zone of Rostov-on-Don. «Sportivnaya» is an innovative substation with modern technologies and equipment. The 110 kV switchgear is made on the basis of an integrated gas-insulated switchgear (manufactured by Alstom company). The facility is equipped with an automated control system, which provides monitoring and control of technological and operational parameters; information on the state of all electrical circuits of the substation is gathered in real time mode. Control of substation devices is provided both from a local workplace and a remote system control center. To complete the construction of the substation within a tight deadline, the work was often carried out around the clock. The builders' conscientious work was recognized with industry awards.
We only use cookies that are strictly necessary for the website to function properly, to ensure your security and maintain session stability.