Contemporary modernization and reconstruction of power facilities ensure their reliability and safety, as well as expand the capacity for connecting new consumers.
Specialists of «Energiya Yuga» carried out reconstruction of the 110/10 kV «Turgenevskaya» substation under live substation conditions, without any interruptions in power supply. A 40 MVA power transformer T-3 was installed at the facility, and modern SF₆ circuit breakers as well as packaged switchgear equipped with microprocessor-based protection and automation systems were commissioned.