Reconstruction of Main Switchgear

Krasnopolyanskaya Hydroelectric Power Plant Reconstruction of the 6 kV main switchgear for “LUKOIL-Ekoenergo” LLC
2018
Krasnodar Krai
Timely modernization of power facilities ensures their reliability and safety. At the Krasnopolyanskaya Hydroelectric Power Plant, the 6 kV main switchgear was reconstructed
The previous equipment had become technically obsolete after more than 50 years of operation. Along with the replacement of the switchgear, ventilation and air conditioning systems were installed.