Substation "OBD"

Reconstruction of a 110/10 kV Substation for PAO «Kubanenergo»
2019
Krasnodar
Continuing the development of Krasnodar’s power system, PAO «Kubanenergo» is increasing extra capacity of its substations. Uninterrupted power supply is the key to success and development in a wide range of industries.
«Energiya Yuga» recognizes its responsibility not only to the client, but also to end consumers. The reconstruction of the 110/10 kV “OBD” Substation included replacement of two outdated 16 MVA power transformers with new 40 MVA units manufactured by Siemens. During construction, installation, and commissioning works, a phased reconstruction approach was implemented to ensure maximum continuity and reliability of electricity supply to connected consumers.