Continuing the development of Krasnodar’s power system, PAO «Kubanenergo» is increasing extra capacity of its substations. Uninterrupted power supply is the key to success and development in a wide range of industries.
«Energiya Yuga» recognizes its responsibility not only to the client, but also to end consumers. The reconstruction of the 110/10 kV “OBD” Substation included replacement of two outdated 16 MVA power transformers with new 40 MVA units manufactured by Siemens.
During construction, installation, and commissioning works, a phased reconstruction approach was implemented to ensure maximum continuity and reliability of electricity supply to connected consumers.