RU

Equipment modernization at the Volgograd Oil Refinery

for “LUKOILVOLGOGRADNEFTEPERERABOTKA” LLC
2019
Volgograd
In 2017, Energiya Yuga constructed four transformer substations at the Volgograd Oil Refinery as part of the enterprise’s power supply system technical re-equipment program.
It took our company less than five months to provide qualified support at the next stage of the modernization project. For the finished product loading and storage unit, two additional block-modular double-transformer substations equipped with complete switchgear and automated control systems were installed. «Energiya Yuga» also carried out the construction of cable racks, installation of power electrical equipment, and the full scope of start-up and adjustment operations.