«Energiya Yuga» performed engineering surveys including a full scope of land management works and developed design and detailed engineering documentation for facilities at the Usinskoye oil field.
Construction is divided into five stages and is intended to provide electric power to oil production wells. The first stage involves expanding the 110 kV outdoor switchgear at the Usinskaya CHP plant by two linear bays, intended to supply power to the designed 110/35/6 kV "21U" substation and LUKOIL-Komi LLC facilities. Subsequent stages include the construction of two substations and power transmission lines with voltage levels of 110, 35, and 6 kV between existing and newly built power supply facilities, with a total line length exceeding 15 km.