“Energiya Yuga” contributed to the implementation of the largest wind power project in Russia in 2019—the construction of the Adygea Wind Power Station with a total capacity of 150 MW.
The new wind farm enhances the stable operation of the power system during peak loads and meets the growing demand for electricity supply.
For Adygea Wind Power Station «Energiya Yuga» developed design and detailed engineering documentation for the power evacuation scheme, which includes a 35/220 kV step-up substation and 14 km of 220 kV overhead transmission line connections.
The company also constructed two new 220 kV overhead transmission lines, "Armavir - Vetropark" and " Centralnaya - Vetropark".