Since 2019 «Energia Yuga» company has been participating in the largest wind energy projects in Russia.
For «Energia Yuga» company and «Novawind» company Bondarevskaya wind power station has become the fourth joint
project after wind power stations in Adygea, Kochubeevskaya wind power station in the Stavropol region and Marchenkovskaya wind power station in the Rostov region.
The scope of work performed by specialists of «Energiya Yuga» company included construction, assembly, installation, and commissioning of forty-eight complete 0.69/35 kV transformer substations, as well as the installation of 35 kV cable lines.
The total installed capacity of the 48 wind turbines at the Bondarevskaya Wind Power Station is 120 MW, with a planned average annual energy generation of 354 million kW/h.
Project Manager: Denis Strunachyov.